These boards were on the floor, stacked up. Someone decided it made a pretty nice dining table! |
To lift the shed, we first had to empty the shed. Hmmm. A lot of stuff.
A good part of the junk removed from the shed. Not everything. A lot of this is destined for the local dump, too. |
Iain spent most of his weekend time in early April removing the shed floor. We'd hoped orginally to salvage some of it, but it all had some rot on it due to sitting in water for most of the last 20 years.
After the floorboards and joists were removed. Messy. |
Just about every weekend leading up to our August holidays was devoted to redoing the shed, once it was lifted.
Working on the new floor. |
You can see in this photo how much higher it is; on cement blocks, it should stay high and dry, even though there is usually some water under it. We were lucky in this being a drier year than last; it would have been much harder to install the new floor if we were working in four inches of puddle.
More to come on this in part two....