October was the month our cottage was supposed to be built.  Sadly, it didn't turn out that way.  Dan the builder man got held up at another job and couldn't get to our place.  So, it was a quiet month.  Here's what happened:
Susan and Mark, our plumbers, finished up connections to the septic.

Iain filled in some holes while I shot pics for the panorama (which I posted on Nov.13 in this blog).

Carl and Iain pulled wire.

The wire-pulling got messy: the conduit had collapsed.  After much digging and making repair efforts, it was decided that a heavy duty cable that doesn't require conduit would do the trick.
And that was pretty much it, for October.   Dan started building on November 1:  that's the next installment.